The laying of the roadbed is horizontal, and should be laid in accordance with the stress direction of the roadbed, avoiding laying on the uneven road base, such as soft soil roadbed, uneven gravel roadbed, because the geocell should give full play to its strength, and its functioning is to ensure that the paving layer of the premise is to ensure that the flatness of the paving layer is good. In addition, after laying geocells on the roadbed, before backfilling, vehicles are prohibited from passing on it, the bearing capacity of the cell without backfilling is limited, and it can't withstand the passage of heavy vehicles, and it must be disassembled and backfilled, and the soil quality is enough to pass the vehicles.
1. Geocell: This is the primary material used to enhance slope stability and reduce soil erosion. Geocells are usually supplied in sheets or rolls.
2. Rooting Nails or Anchor Bolts: These are used to secure the geocell and prevent it from moving or shifting during backfilling. Used at the edges of the geocell.
3. backfill material: this is the material that fills the space inside the geocell. Backfill materials used include soil, concrete or gravel. The material selected should be based on project needs and design requirements.
4. manual tamping or compaction equipment: used to compact the backfill material to ensure that it achieves the required density and stability.
5. Knives or scissors: Used to trim and adjust geocells to fit the shape and size of the slope. These tools can be used to cut geocell sheets or rolls.
6. measuring equipment (e.g. rangefinders or measuring tools): if required to accurately measure the dimensions of the slope to ensure proper geocell coverage.
7. Edge protection material (optional): Sometimes the installer may need to add more edge protection material to prevent damage to the geocell edges at the top or bottom of the slope.
8. Other safety equipment (as required): Depending on the work environment and safety regulations, appropriate safety equipment such as gloves, helmets and goggles may be required.
![]() |
![]() |
![]() |
Geocell installation extension:
The laying of the roadbed is horizontal, and should be laid in accordance with the stress direction of the roadbed, avoiding laying on the uneven road base, such as soft soil roadbed, uneven gravel roadbed, because the geocell should give full play to its strength, and its functioning is to ensure that the paving layer of the premise is to ensure that the flatness of the paving layer is good. In addition, after laying geocells on the roadbed, before backfilling, vehicles are prohibited from passing on it, the bearing capacity of the cell without backfilling is limited, and it can't withstand the passage of heavy vehicles, and it must be disassembled and backfilled, and the soil quality is enough to pass the vehicles.
PROJECT CASES
Apr 25,2024
Apr 25,2024
Apr 25,2024
Apr 25,2024
Apr 25,2024
Apr 25,2024
Apr 25,2024
Apr 25,2024