What issues should be paid attention to during the construction of fabric formed concrete?
Release time:
2024-07-16
The construction of fabric formed concrete requires attention to many details and issues. Only by strictly following the construction specifications can the quality and safety of the project be ensured.
Construction preparation
1.Material inspection: Ensure that the fabric formed concrete has damage or holesno , and the quality meets the design requirements. At the same time, check whether other auxiliary materials such as fixed piles, anchoring tools, concrete raw materials, etc. are complete and of qualifiedty.
2.On-site measurement and cleaning: Accurately measure the size of the construction area, clean up the deb qualiris on site, and ensure that the construction surface is flat and free of sharp objects.
3.Equipment preparation: Prepare the equipment required for construction such as pouring equipment, mixers, measuring tools, etc., and check whether their performance is good.
Laying and fixing
1.Laying order: Lay the geomembrane bag according to the requirements of the construction drawings, pay attention to the direction and sequence, and ensure that the overlap is correct. Avoid excessive stretching or folding of the geomembrane bag during laying.
2.Fixing method: Set up fixed piles at the upper end of the fabric formed concrete and evenly distribute them along the axis direction. The spacing of the fixed piles should be determined according to the design requirements, generally not more than 2 meters. Fix the upper end of the fabric formed concrete on the fixed pile, and then unfold it along the lower end of the mold bag and position it straight. When overlapping adjacent mold bags, overlap cloth should be used for overlap, and a certain length should be reserved as shrinkage surplus weight.
3.Precautions: During the laying process, the fabric formed concrete should be prevented from contacting with sharp objects to avoid scratches or punctures. At the same time, ensure that the fabric formed concrete is laid flat and wrinkle-free.
Concrete pouring
1.Concrete preparation: Prepare concrete according to design requirements, and pay attention to controlling parameters such as cement slurry volume, sand ratio, and gravel particle size. The mix ratio of mold bag concrete and ordinary concrete is different, so special attention should be paid.
2.Pouring operation: Inject the prepared concrete into the fabric formed concrete through the pouring equipment. During the pouring process, the dynamic tension of the mold bag should be kept uniform to avoid the mold bag from swelling or offset. At the same time, the tensioner should be adjusted in time to control the pouring speed.
3.Inspection and adjustment: During the pouring process, the filling of the mold bag should be tracked and checked. If problems such as poor flow, blockage or offset are found, they should be dealt with in time. When the pouring is almost full, it should be paused for a while until the water in the mold bag is analyzed out before continuing to pour until it is full.
![]() |
![]() |
![]() |
![]() |
Subsequent treatment and testing
1.Close the filling port: After each filling port is filled, it should be tied with a rope in time to prevent concrete from overflowing.
2.Overall inspection: After the construction is completed, the entire fabric formed concrete should be inspected as a whole to ensure that there are no omissions or deficiencies. At the same time, check whether the fixing piles are firm and reliable.
3.Leakage detection: Leakage detection is carried out to verify whether the anti-seepage performance of the fabric formed concrete meets the requirements. If there is leakage, it should be repaired or replaced in time.
![]() |
![]() |
![]() |
Other precautions
1.Construction environment: Pay attention to the impact of weather and environmental conditions on construction. Avoid construction in bad weather or unfavorable environment to avoid affecting construction quality and safety.
2.Construction safety: Strictly abide by construction safety regulations to ensure the personal safety of construction workers. Set up safety warning signs and protective measures to prevent accidents.
3.Environmental issues: Pay attention to environmental issues to avoid damage to the environment and ecology. Waste and wastewater generated during the construction process must be properly handled and must not be discharged or discarded at will.
With this information, you can better choose the fabric formed concrete product supplier that suits your project to ensure the smooth progress and high-quality completion of the project. Huaxiang is a fabric formed concrete product manufacturer. If you have a project that requires fabric formed concrete products, you can contact us. Our service staff is online 24 hours a day to provide you with professional technical guidance. We can also provide you with free fabric formed concrete product samples!